HONG KONG CONVENTION AND EXHIBITION CENTRE

ATRIUM LINK EXTENSION

 

Environmental Impact Assessment

 

EXECUTIVE SUMMARY

 

 

 

TABLE OF CONTENTS

 

 

1          INTRODUCTION

Background of the Project

Design of the Project

Consideration of Alternatives

2          PROJECT DESCRIPTION

3          KEY FINDINGS OF THE ENVIRONMENTAL IMPACT ASSESSMENT

Air Quality

Noise Impact

Water Quality

Waste Management

Landscape and Visual Impact

Environmental Monitoring and Audit

4          Overall Conclusion

 

List of Figures

 

Figure 1.1          Location of the Proposed Atrium Link Extension

Figure 1.2          Longitudinal Section of the Proposed Atrium Link Extension

Figure 1.3          Alternative Project Design (Schemes 1 & 2 – With Larger Footprint)

Figure 1.4          Alternative Project Design (Scheme 1 – Without Intermediate Column Support)

Figure 1.5          Alternative Project Design (Scheme 2 – With Intermediate Column Support)

Figure 1.6          Alternative Construction Method for Temporary Working Platform (Option 1)

Figure 1.7          Alternative Construction Method for Temporary Working Platform (Option 2)

Figure 1.8          Alternative Construction Method for Temporary Working Platform (Option 3)

Figure 1.9          Landscape Roof Plan